>> The job we're doing here, we took

00:00:01.580 --> 00:00:07.230
about a 1,500 square foot house
and we had a second story on it.

00:00:07.230 --> 00:00:12.460
I think overall we added 2,300 square
feet, so pretty much from start

00:00:12.460 --> 00:00:15.800
to finish, it's about a year long project.

00:00:15.800 --> 00:00:21.570
Made a straight line here because I'm
going to extend this wall down so that,

00:00:21.570 --> 00:00:26.280
see so I'm going to have a
wall like this here also.

00:00:26.280 --> 00:00:30.400
Because originally it was just,
it was just stopping right

00:00:30.400 --> 00:00:34.290
where it is and that tub was pushed back.

00:00:34.290 --> 00:00:39.990
So we took the toilet out from there and moved
it over to behind you and then this wall's going

00:00:39.990 --> 00:00:42.090
to come down further and have a bigger shower.

00:00:42.090 --> 00:00:44.470
On a job this size, you're
pretty much going to be talking

00:00:44.470 --> 00:00:47.850
to the homeowner at least every other day or so.

00:00:47.850 --> 00:00:51.070
You've got to stay ahead on ordering stuff.

00:00:51.070 --> 00:00:56.010
I have a front door actually ordered now, but
that took a while to figure out what they want

00:00:56.010 --> 00:00:59.020
and as soon as we get it
drywalled and insulated,

00:00:59.020 --> 00:01:05.870
we'll look at hardwood floor finishes, we'll
have to discuss, the homeowner and I, cabinets,

00:01:05.870 --> 00:01:08.860
countertops, tile, bathroom fixtures.

00:01:08.860 --> 00:01:11.660
So on something like this, this
big, you're pretty much in contact

00:01:11.660 --> 00:01:14.820
with the homeowner almost every other day.

00:01:14.820 --> 00:01:15.960
>> Yeah, it's all new electric.

00:01:15.960 --> 00:01:20.010
It was all ragwire electric so, that was
all torn out, almost all new plumbing.

00:01:20.010 --> 00:01:23.230
We had to keep three walls
to still have it be a remodel

00:01:23.230 --> 00:01:26.110
and not an actual new home
for permitting purposes.

00:01:26.110 --> 00:01:31.760
They had three bedrooms upstairs and I
believe, I think we're on four full baths,

00:01:31.760 --> 00:01:37.410
so we added new kitchen, everything,
and a 20 by 20 addition, two story.

00:01:37.410 --> 00:01:40.300
Getting the contract for a job like this,

00:01:40.300 --> 00:01:43.750
there's actually several steps
before you ever even break ground.

00:01:43.750 --> 00:01:50.380
First would be several meetings with the
homeowner, budgeting, what they like exactly

00:01:50.380 --> 00:01:54.700
and meeting with the architect and getting
plans drawn out to submit for permit.

00:01:54.700 --> 00:01:59.110
After that, draw the permits, you need to
break ground and start from the ground up.

00:01:59.110 --> 00:02:04.660
My ideal job would have to be probably
just building decks, in the summertime.

00:02:04.660 --> 00:02:09.330
You're outside all day, you get in a
good workout, and then in the wintertime,

00:02:09.330 --> 00:02:11.160
just moving to finishing basements.

00:02:11.160 --> 00:02:14.170
Don't get cold in the basement,
finish basements all winter long.

00:02:14.170 --> 00:02:15.820
Those would be the two ideal ones.

00:02:15.820 --> 00:02:17.100
Bathrooms are too small.

00:02:17.100 --> 00:02:20.480
I'm here almost every day checking on guys,
some of the subs that I have in there,

00:02:20.480 --> 00:02:23.000
like I have plumbers and
electricians in there now,

00:02:23.000 --> 00:02:25.590
and I'll do other small jobs
as I'm doing this job.

00:02:25.590 --> 00:02:29.610
We probably have like three
more months on this job.

00:02:29.610 --> 00:02:34.170
We're close to closing in the outside with
siding and everything and within the next week

00:02:34.170 --> 00:02:37.750
or so, we'll have all the inspections
done for all the trades: HVAC,

00:02:37.750 --> 00:02:41.680
plumbing, electric, and my close-in.

00:02:41.680 --> 00:02:45.090
So we'll be able to go with insulation and
drywall and then it's just all the finishes:

00:02:45.090 --> 00:02:50.490
your hardwood flooring, window, any
trim, interior doors, kitchen finishes,

00:02:50.490 --> 00:02:54.890
bathroom finishes, and finish out
from there, about three months.

00:02:54.890 --> 00:03:00.630
I mean, that makes me feel good, first off
because I can see that I accomplished something.

00:03:00.630 --> 00:03:04.550
And then once the homeowner's happy,
then everything's done and you're good.

00:03:04.550 --> 00:03:07.990
As long as the homeowner's happy, as a
contractor, you should be happy, really.